Logo for ADAMSTOWN GRAVITY SEWER PROJECT-PHASE1

ADAMSTOWN GRAVITY SEWER PROJECT-PHASE1

The Adamstown Gravity Sewer Phase 1 involves the construction of a gravity sewer line in Adamstown Maryland with approximately 5,275 LF of new 8-inch PVC sewer line, 21 Sewer Manholes and associated sewer...

Logo for CAMBRIDGE FARMS WATER STORAGE TANK NO. 2

CAMBRIDGE FARMS WATER STORAGE TANK NO. 2

                          DIVISION OF WATER AND SEWER UTILITIES, DEPARTMENT OF ENGINEERING & PLANNING

Logo for DESIGN MANUAL FOR WATER AND SEWER UTILITIES UPDATES

DESIGN MANUAL FOR WATER AND SEWER UTILITIES UPDATES

This page is dedicated to the release and open discussion of the Division of Water and Sewer Uilities, Department of Engineering and Planning, Design Manual for Water and Sewer Utilites 

Logo for FOUNTAINDALE SANITARY SEWER CLEANOUT INSTALLATIONS

FOUNTAINDALE SANITARY SEWER CLEANOUT INSTALLATIONS

The Division of Water and Sewer Utilities (“DWSU”) owns and maintains the public sanitary sewer system in Fountaindale (North and South).  In a typical sanitary sewer system, the pipe...

Logo for LEWISTOWN WASTEWATER COLLECTION SYSTEM

LEWISTOWN WASTEWATER COLLECTION SYSTEM

PROJECT DESCRIPTION: The Lewistown Wastewater Collection System project is the proposed construction of public sewer within the Lewistown Sewer Service Area. The project includes construction...